Maccari Energia / Installation, maintenance and on-site technical teams
Installation, maintenance and on-site technical teams
The engineer who signs the design also follows the construction work.
For years we delivered designs and clients then had to find someone to build them. We now provide installation as well.
The reason is practical: the designer knows why each decision was made, which shortens construction.
Field services
Installation and construction
We carry out industrial and building electrical installations, panel, substation and SPDA assembly, and the corrective work identified in reports.
We work to a defined scope and schedule. Construction is followed by the engineer responsible for the design, not by a supervisor who received the drawings the day before.
Field services
Electrical maintenance
Preventive and corrective maintenance, substation and primary-cabin maintenance, scheduled thermography and testing.
Contracts have a defined frequency, a report after every visit and an installation history. That history shows what is degrading before it fails and is what insurers request after a loss.
Field services
Resident technical team
Electricians and technicians allocated to your facility under a service contract with scope, indicators and signed technical responsibility.
The entire team has current NR-10 and NR-12 training, with PPE supplied by us. You do not manage our personnel; you contract an outcome, and technical supervision remains ours.
Next step
Tell us what you need to keep running. We will prepare a proposal with scope and service frequency.
Describe what you need through the form or WhatsApp, including size and deadline. Attaching a drawing speeds up the process.
02
Technical consultation
We reply within one business day for a short technical conversation to define scope and verify applicable requirements.
03
Proposal
We send a proposal stating inclusions, exclusions, price and schedule.
04
Delivery
We deliver with the ART issued.
Who signs
IDENTIFIED TECHNICAL RESPONSIBILITY.
Every project and technical report issued by Maccari is signed by a qualified professional registered with the appropriate professional council, with an ART or TRT duly filed. You know who is technically accountable before hiring us and after delivery.
The technical team includes electrical engineers, occupational safety engineers and electrotechnical technicians, with consolidated experience in 15, 25 and 35 kV networks.
Every stage has a designated technical professional
From survey to commissioning, responsibility is registered in the name of the professional who performed the work.
Frequently asked questions
DIRECT ANSWERS.
Yes. We work throughout Brazil and have delivered projects in RS, SC, PR, SP, MS and MG. Travel is itemized in the proposal.
Yes. Every project and report includes an ART issued in the responsible engineer’s name.
Most reports are delivered within 10 business days after inspection. Industrial facility projects take 10 to 20 business days depending on capacity, and network projects take 20 to 35 depending on the number of lots. The PIE takes 30 business days, while a power quality report takes 15 to 20 because it includes the seven-day PRODIST measurement campaign. Every proposal includes a firm delivery date.
Yes, if you want us to. The construction quote is presented later and separately from the design or report. You remain free to hire any contractor.